On the Agenda: TetraTech Sewer Capacity Presentation, Washtenaw County Road Commission Annual Meeting
At this meeting Township Manager Howard Fink made the astonishing assertion that his back-of-the-envelope calculations showed that the proposed $3,000,000.00 WWTP expansion, the holding tank, wouldn't cost anyone a dime of increased fees.
Watch the 3-29-2016 Northfield Township Board meeting in High(er)-Def on our Youtube channel. This video incorporates our repair of the two minute Livestream dropout that occured during the Road Commission session.
Our 3-29-2016 Northfield Township Board - Planning Commission Joint Session LiveAgenda
Downloadable documents:
- 3-29-2016 Northfield Township Board of Trustees - Planning Commission Joint meeting agenda
- 3-29-2016 Northfield Township Board of Trustees - Planning Commission Joint meeting packet [14.1 MB]
- TetraTech Sewer Capacity documents, extracted from the meeting packet:
- 3-21-2016, Tetra-Tech Sewer Policy letter with questions, packet pp24-25
- March 2016, Tetra-Tech WWTP Northfield Township Wastewater Treatment Plant Wet Weather Storage Tank, Preliminary design, packet pp 27-50 [736KB]
- Appendix A: 3-18-2015 Tetra-Tech Northfield Township WWTP Capacity Evaluation Report, packet pp49-74 [1.46MB]
- Appendix B: Northfield Township Wastewater Treatment Plant Drawings, packet pp76-81 [4.2MB]
- Appendix C: 12-31-2015 Tetra-Tech Cost Opinion, packet p-83
- Appendix D: TTL-Environmental-Soil Boring Proposal, packet pp85-92
- Northfield Township SAD sewer service area maps, packet pp94-95 [2.6MB]
- Washtenaw County Road Commission documents:
- 3-29-2016 Washtenaw County Road Commission report to Northfield Township Board of Trustees, packet pp 2-23 [5.5MB]